Mineral resource and reserve statement

Resources and reserves reflected in this statement are reported on a Northam attributable basis, and include those which are either from properties that are wholly owned by Northam or its wholly owned subsidiaries, or joint venture properties in which Northam holds a stake.

Mineral resources are reported inclusive of mineral reserves.

SCOPE OF REPORTING

Resources and reserves reflected in this statement include those from the following properties:

  • Zondereinde, the company’s wholly owned PGM mine, located in the Thabazimbi area of the Limpopo province and within the northern portion of the western limb of the Bushveld Complex. This includes both the Zondereinde and Middeldrift portions of the property;
  • Booysendal, 100% owned by Northam’s wholly owned subsidiary, Booysendal Platinum Proprietary Limited (previously Micawber 278 Proprietary Limited) and situated in the southern portion of the eastern limb of the Bushveld Complex;
  • Dwaalkop, located in the northern portion of the eastern limb of the Bushveld Complex, in which Northam holds a 50% stake through its wholly owned subsidiary Mvelaphanda Resources. Dwaalkop is managed by Lonmin plc (Lonmin); and
  • Pandora, located in the Brits area of North West province and within the southern portion of the western limb of the Bushveld Complex, in which Northam holds a 7.5% stake. Pandora is managed by Lonmin.

KEY POINTS AND SIGNIFICANT REVISIONS FROM LAST YEAR

  • The reassignment of Merensky resource to, together with the estimation of Merensky reserve in, the Booysendal UG2 North mine (BY UG2 mine), which has consequently been renamed Booysendal North mine. This follows the completion of a feasibility study for mining of Merensky reef in the Booysendal North area.
  • The reassignment of resources between Booysendal North and Booysendal South. This follows an amendment to the internal Booysendal resource boundaries to align to future mining plans. This reassignment does not result in a change to the combined Booysendal resource content outside of the Booysendal North Mine area.
  • The estimation of Merensky and UG2 reserves to 18 level on Zondereinde mine. This follows an amendment to reporting procedures at Zondereinde mine, which previously permitted only the inclusion of reserves from accessed mining levels (to 16 level), and now includes reserves from areas for which there is committed capital for infrastructure to support a mining plan.
  • The inclusion of an indicative content for the Everest mining right. This is informed by the resource and reserve estimated by AQPSA and follows the acquisition by Northam of the Everest mine assets from AQPSA. An estimate of the Everest resource and reserve will be included upon completion of transfer of the Everest mining right to Northam.

REGULATORY COMPLIANCE

The mineral resource and mineral reserve statements for Northam have been prepared under the guidance of the company’s lead competent persons who are duly registered with The Engineering Council of South Africa (ECSA; Private Bag X691, Bruma, 2026, South Africa; www.ecsa.co.za) and/or with the South African Council for Natural Scientific Professions (SACNASP; Private Bag X540, Silverton, 0127, South Africa; www.sacnasp.org.za). This ensures that the mineral resource and mineral reserve statements comply with the provisions of the South African Code for Reporting of Mineral Resources and Mineral Reserves of 2007, revised in 2009 (SAMREC 2009). The company’s competent persons have taken cognisance of definitions included in the code. The mineral resource and mineral reserve quantities reported here are considered to be fully compliant in all material respects with the requirements of the code, and the lead competent persons have given written confirmation of such.

Definitions of the various mineral resource and mineral reserve categories as well as the requirements for reporting of exploration results may be found at www.samcode.co.za/downloads/SAMREC2009.pdf.

STATUS OF MINERAL RIGHTS

Resources reflected in this statement include those of the Zondereinde and Booysendal concessions which are wholly owned by Northam or its wholly owned subsidiaries. In addition, Northam holds a 7.5% stake in the Pandora joint venture and a 50% stake in the Dwaalkop joint venture, both of which are managed by Lonmin, through its subsidiaries, Eastern Platinum Limited and Western Platinum Limited respectively.

Northam holds new order mining rights over both the Zondereinde and Booysendal mines.

The Pandora mine operates under a new order mining right which was converted from an old order right in 2013.

The Dwaalkop joint venture holds a new order prospecting right over the Dwaalkop prospect. This right is subject to a renewal application. An application for a new order mining right was submitted in 2009 and is being processed.

Northam further holds eight new order prospecting rights over the Kokerboom prospect, granted in 2009. Kokerboom is an iron oxide copper gold and massive sulphide copper zinc exploration prospect covering some 1 000 000 hectares of the Northern Cape province of the Republic of South Africa. A prospecting work programme is currently in progress and no resource or reserve has yet been estimated.

Northam entered into an agreement with AQPSA on 9 February 2015 to transfer the new order mining right (127MR) in respect of Everest mine. In this regard, an application for consent by the Minister of Mineral Resources for AQPSA to this transfer terms of section 11 of the MPRDA is in process.

CONTINUING OPERATIONS

The company confirms that it is not aware of any legal or arbitration proceedings, either pending or threatened, which may have or have had a material effect on the financial position of the company and its subsidiaries.

Further to this, the risk management section of this report analyses potential risks which may impact the company’s ability to continue its activities.

ENVIRONMENTAL LIABILITIES

The company’s environmental obligations are managed in terms of approved environmental management plans. Compliance with the plans is audited by independent external parties on a regular basis. Details of the environmental liabilities are contained in note 20 to the 2015 annual financial statements and details of the funding of the environmental liabilities are contained in note 10 and note 11 to the 2015 annual financial statements.

GROUP RESOURCES AND RESERVES

The following tables summarise the mineral resources and reserves attributable to Northam for both the current and previous year. Notes on the reporting criteria are pertinent, together with specific notes to this section.

Breakdowns of the mineral resources and reserves into their respective confidence categories may be found in the sections specific to the concessions.

SUMMARY OF MINERAL RIGHTS HELD AND MANAGED BY NORTHAM

PropertyType of rightStatus
Zondereinde mineNew order mining rightConverted mining right
Booysendal mineNew order mining rightConverted mining right
Pandora mineNew order mining rightConverted mining right
Dwaalkop prospectNew order prospecting rightApplication for a new order mining right in process
Kokerboom prospectNew order prospecting rightsEight new order prospecting rights granted

Prospecting and mining rights are held in good order, and Northam perceives no risk to its rights to continue prospecting for and mining of minerals over any of its properties.

GEOLOGICAL SETTING – THE BUSHVELD COMPLEX

The two-billion-year-old Bushveld Complex is the largest layered igneous complex in the world, and is the repository for around 85% of known global PGM resources. Extending over an area of some 67 000km² within the north-eastern portion of the Republic of South Africa, it contains the intrusive, mafic- ultramafic Rustenburg Layered Suite (RLS), which outcrops as three main acicular limbs, namely the western, eastern and northern limbs (see figure below), and ranges in thickness from 7km to 12km.

The magmatic layering in the RLS is laterally persistent and can be correlated throughout most of the complex. Layering is generally shallow dipping towards the centre of the complex. The RLS stratigraphy is sub-divided into five zones, which are, from lowest to highest, the marginal zone, the lower zone, the critical zone (which is further subdivided into a lower and upper unit), the main zone and the upper zone.

PGM and associated precious and base metal mineralisation is hosted in or adjacent to chromitite seams located within the upper critical zone of the RLS. There are two significant orebodies from which 75% of global primary PGM production is derived, these being the UG2 and Merensky reefs. The vertical separation between the UG2 and Merensky reefs is variable across the Bushveld Complex, ranging from 20m to 140m on the western limb and between 170m and 400m on the eastern limb.

Historically, PGM production was concentrated on the western limb but, in recent years, the eastern limb has been the focus of new mine development.

The two wholly-owned Northam properties, the Zondereinde and Booysendal mines, contain resources of both the UG2 and Merensky reefs.

Bushveld location indicating current PGM mining operations

COMPETENT PERSONS

The resource and reserve statement for the Zondereinde and Middeldrift portions of Zondereinde mine were compiled by Charl van Jaarsveld, BSc (Hons) Geology, PrSciNat. (400268/05); chief geologist at Zondereinde mine, with 12 years’ experience relevant to Bushveld-related resource and reserve estimation.

The Booysendal resource statement was compiled by Meshack Mqadi, BSc (Hons) Geology, MGSSA (966985); chief geologist at Booysendal North mine, with seven years’ experience relevant to precious metal-related resource estimation.

The Booysendal reserve statement was compiled by Willie Theron, BSc (Hons) Mining, PrCertEng, ECSA (200790030); general manager at Booysendal UG2 North mine with 18 years’ experience of Bushveld-related underground mining and reserve estimation.

Resource and reserve estimates for both Zondereinde and Booysendal were reviewed by Damian Smith, BSc (Hons) Geology, MSc, PrSciNat. (400323/04); principal member of Prospect Geoservices with 25 years’ experience in mining and exploration geology, 19 years of which are relevant to Bushveld- related resource and reserve estimation.

The resource and reserve estimates for the Pandora joint venture were prepared by a team from both Anglo Platinum and Lonmin. Resources were signed off by J Witley (Lonmin) and P Stevenson (Anglo American Platinum), while reserves were signed off by AA Brown (Lonmin).

The resource and reserve estimates for the Dwaalkop joint venture were prepared by a team from Snowden Mining Industry Consultants (Resources) and from AMC Consulting (Pty) Limited (Reserves). Resources were signed off by D Hoffmann (Lonmin), while reserves were signed off by AA Brown (Lonmin).

Contact details for Northam’s lead competent persons authorising publication of the resource estimates are contained within the notes on reporting criteria below.

NOTES ON REPORTING CRITERIA

  • Mineral resource tonnages and grades for Zondereinde are reported as estimates discounted for geological and mining pillar losses. All other mineral resources are reported as estimates discounted for geological losses.
  • Mineral resource tonnages and grades are in situ estimates inclusive of internal waste dilution but exclusive of external waste dilution, unless otherwise stated.
  • PGM grade is expressed as corrected 4E (combined platinum, palladium, rhodium and gold) grade; this being synonymous with 3PGE+Au and 4E PGE.
  • PGM metal prill splits (platinum, palladium, rhodium and gold) are expressed as percentages of the combined 4E value.
  • Base metal contents (chromite, copper and nickel) are expressed as weight percentages.
  • Structural losses, due to faults, dykes and joints, include the volumes of expected bracket pillars required to be placed on such features.
  • Kriging parameters are applied to discrete mining areas in order to estimate tonnage and metal content.
  • Kriging parameters are derived from the interrogation of extensive sampling databases.
  • Rounding of numbers in the tables may result in minor computational discrepancies. Where this occurs, it is deemed insignificant.
  • The most reasonable mining width is assumed, based on practical mining conditions. 4E PGE grade, together with specific gravity are calculated for these widths.
  • Total mineral resources and reserves attributable to Northam are listed in the summary tables.
  • Mineral resources for Pandora and Dwaalkop, reflecting Northam’s 7.5% and 50.0% respective attributable interests, are quoted as at the end of September 2014 and 2013 and are provided by Lonmin.
  • Measured and indicated mineral resources are reported separately and include those mineral resources modified to produce proven and probable mineral reserves.
  • While mineral resources are quoted as in situ resources, all reserves provided by Northam are quoted at run-of-mine (ROM) grades and tonnages as delivered to the concentrator plants on site and are therefore, fully diluted.
  • Mineral reserves for Zondereinde mine are quoted to 18 level (2 354m below surface).
  • Mineral reserves for Booysendal relate to the first planned mining module, the Booysendal North mine.
  • Mineral reserves for Pandora and Dwaalkop are provided by Lonmin and reflect Lonmin’s reserve modifying factors.
  • All references to tonnage are to the metric unit.
  • All references to ounces are troy with a conversion factor of 31.103475 used to convert from metric grams to ounces.

Contact details for lead competent persons are:

  • Mr C van Jaarsveld, chief geologist at Zondereinde mine, PO Box 441, Thabazimbi 0380
  • Mr M Mqadi, chief geologist at Booysendal UG2 North mine
  • Mr W Theron, general manager at Booysendal UG2 North mine, PO Box 412694, Craighall 2024
  • Mr D Smith, principal member of Prospect Geoservices, PO Box 37876, Faerie Glen 0043